Task List

May Work Weekend

May 19, 20, 21 2000

 

 

 

 

 

ELECTRICAL – General Repair

Task

By

Status

Description

1.      

---

---

Install a utility receptacle in the galley for a coffee pot.  Wire the receptacle to ??

2.      

---

---

Repair inoperable light fixture in FER lower level aft port corner.

3.      

---

---

Reinsulate wires of light fixture in FER lower level fwd stbd corner.  Install globe on fixture.

4.      

DF, RB, GP

Done
5/20/00

Repair fluorescent lamp in FER C/L over #1 Engine.

5.      

DF, GP

Light works. Needs more repair.
5/20/00

Repair fluorescent lamp in AER over aft end of #4 Engine (aft port corner).

6.      

RB

Light works. Needs more repair.
5/19/00

Repair inoperable fluorescent light fixture in control room aft stbd corner by Radio.  Replace ballasts.

7.      

RB

Light works. Needs more repair.
5/19/00

Repair inoperable fluorescent light fixture in control room aft port corner by Trim Manifold.  Replace ballasts.

8.      

RB

Light works. Needs more repair.
5/19/00

Repair inoperable fluorescent light fixture in control room aft port corner by Dive Stand.  Replace ballasts.

9.      

---

---

Repair inoperable light fixture in dry stores below ladder.  Reinsulate the wires.  Install globe on fixture.

10.  

---

---

Reinsulate the two remaining lights in dry stores, center light and port outboard light.  Install globes on fixtures.

11.  

---

---

Check galley power panels for mixer circuit.  Trace power cable, if still installed, to find the cut end.  Tag the cable.

12.  

---

---

Repair inoperable light fixture in after port corner of maneuvering.  Reinsulate the wires.  Install globe on fixture.

13.  

AB

Traced power leads to ATR head.  Wires are not terminated.  Cables should be pulled back to DC lighting panel and terminated.
5/19/00

Repair two inoperable light fixtures in pyro locker, forward stbd corner of ATR.  Install globes on fixtures.

14.  

---

---

Trace the source of the two cut cables located over the center of the #4 engine in after engine room lower level.  Tag cables.

15.  

---

---

Clean, repair, and paint the broken light fixture bracket for the light fixture in FER outboard of #1 engine.

16.  

---

---

Cut off broken cover fastening barrels and screws and install new cover fasteners on FB-124 fuse panel outboard port engine in FER.  Use WD-40 to lubricate cover fastening bolts.

17.  

---

---

Cut off broken cover fastening barrels and screws and install new cover fasteners on FB-124 fuse panel outboard port engine in AER.  Use WD-40 to lubricate cover fastening bolts.

18.  

---

---

Cut off broken cover fastening barrels and screws and install new cover fasteners on FB-124 fuse panel FDB-4 in Control Room.  Use WD-40 to lubricate cover fastening bolts.

19.  

---

---

Trace the ?? circuit in FB-124 fuse panel located in after port corner of control room.  Circuit has low resistance to ground.  Determine cause and repair.

20.  

---

---

Trace the ?? circuit in FB-124 fuse panel located in after port corner of control room.  Circuit has low resistance to ground.  Determine cause and repair.

21.  

DG, DF, AB

Done
5/19/00

Repair stbd. DC lighting circuit in forward battery well.

22.  

DG

Done
5/19/00

Replace lamp holder in pantry closet. (stbd. side fwd.)

23.  

DF

Done
5/13/00

Repair mirror light in XO SR.

24.  

---

---

Replace missing switch on 18-FB-102/103 (Fwd Battery, aft bulkhead).

25.  

---

---

Replace missing switch on 13-FB-102 (Control Room, stbd. by IC swbd).

26.  

---

---

Replace two AC receptacles on fwd. stbd. bulkhead in Crews Berthing.

27.  

---

---

Trace the power source for the Yarway lights in Crew’s head.

28.  

---

---

Trace the power source for the Yarway lights in FTR head.

29.  

---

---

Sort and inventory electrical parts in Dry Stores.

30.  

MW, PO

Done
5/20/00

Reinsulate wires in DC fixture on forward port side of FTR escape trunk.

31.  

MW, PO

Done
5/20/00

Reinstall rig for red light in FTR head.

32.  

MW, PO

Done
5/20/00

Check all globes in FTR for proper installation (Red on rig for red lights, clear on others).

33.  

MW, DR

Done
5/20/00

Repair DC light in forward port corner of FTR outboard tubes 2, 4, & 6.

34.  

MW, PO

Replaced light bulb.  Light still does not work.
5/20/00

Repair light in forward stbd corner of FTR outboard tubes 1, 3, & 5.

35.  

MW

Removed ceramic light fixture.  Repairing pressure tight fixture, will install later.

Replace light fixture in FTR escape trunk with a pressure tight light fixture. 

36.  

DF

All three lights work.  Some repair still needed.
5/19/00

Repair fluorescent lights in officers passageway.

37.  

---

---

Repair the light switch for bunk lamp on top outboard rack of CPO quarters.

38.  

---

---

Repair the light switch in closet for overhead light in CPO quarters.

39.  

 

 

 

40.  

 

 

 

 


 


 

 

ELECTRICAL – Shore Power

Task

Priority

Status

Description

1.      

DT, ME

Done
Used 2 NEG cables instead of 2 POS cables.
See NOTE 1.

5/19/00

Disconnect two of the FB-0201 (POS) cables in the port cubicle in maneuvering.  Continuity check the two cables to identify the other end in after battery.  Tag the cables #1 and #2 at both ends.

2.      

DT

Done
Used 2 NEG cables instead of 2 POS cables.
See NOTE 2.
5/19/00

Megger the two of the FB-0201 (POS) cables.  Record the insulation resistance of each cable to ground.

3.      

---

---

Remove shore power junction box and cable from sail.  Disconnect the cable from the shore power junction box in AER.

4.      

 

 

 

5.      

 

 

 

6.      

 

 

 

7.      

 

 

 

8.      

 

 

 

9.      

 

 

 

10.  

 

 

 

 

 

NOTE 1:  Removed a section of the NEG bus bar in Port Motor Cubicle and stored it and the mounting hardware in the Maneuvering Electrical locker #7.

 

NOTE 2:  Resistance to ground approximately 10 megohm on both cables.

 


 


 

 

ELECTRICAL – Emergency Lighting

Task

By

Status

Description

1.      

DT, ME, JE

Done

5/20/00

Go through the boat and place all emergency light switches in the ON position.  Close the power disconnect switch in after battery well.  Megger the power cables in after battery well.  Record the insulation resistance of each power cable to ground.

2.      

DT, ME, JE

Done

5/20/00

Close the power disconnect switch in forward battery well.  Megger the power cables in forward battery well.  Record the insulation resistance of each power cable to ground.

3.      

DT, GC, DF, ME, JE

Tested all lights in Fwd Batt, Cntrl Rm, Con Twr, Pump Rm, Plot, Aft Batt, FER(UL), AER(UL), Man
See NOTE 1.
5/20/00

Test all emergency lights using 120V AC.  Replace light bulbs and repair light fixtures as necessary.

4.      

 

 

 

5.      

 

 

 

6.      

 

 

 

7.      

 

 

 

8.      

 

 

 

9.      

 

 

 

10.  

 

 

 

 

 

NOTE 1:  Still need to check lights in FER(LL), AER(LL), ATR, FTR, Motor Rm.  Several lights required new bulbs.  One light missing in After battery from port emergency lighting and one light missing in After battery from stbd emergency lighting.  All other lights work.

 


 

 

 

 

Interior Communications

Task

By

Status

Description

1.      

HM, GC(sb)

Done
Handset works.
5/19/00

Test / Repair sound powered handset at ATR growler.

2.      

HM, GC(sb)

Done
Handset works.
5/19/00

Test / Repair sound powered handset at Maneuvering room growler.

3.      

HM, GC(sb)

Handset needs to be replaced.
5/19/00

Test / Repair sound powered handset at AER growler.

4.      

HM, GC(sb)

Done
Handset works.
5/19/00

Test / Repair sound powered handset at FER growler.

5.      

HM, GC(sb)

Done
Handset works.
5/19/00

Test / Repair sound powered handset at Crew’s Mess growler.

6.      

---

---

Test / Repair sound powered handset at Radio Room growler.

7.      

---

---

Install and test sound powered handset at Control Room growler.

8.      

---

---

Test / Repair sound powered handset at Conning Tower growler.

9.      

---

---

Test / Repair sound powered handset in CO’s Stateroom.

10.  

---

---

Test / Repair sound powered handset at Wardroom growler.

11.  

---

---

Install and test sound powered handset at FTR growler.

12.  

---

---

Test / Repair sound powered handset at Radio Room growler.

13.  

HM, GC(sb)

Done
Growler works.
5/19/00

Test / Repair growler in ATR.

14.  

HM, GC(sb)

Done
Growler works.
5/19/00

Test / Repair growler in Maneuvering.

15.  

HM, GC(sb)

Done
Growler works.
5/19/00

Test / Repair growler in AER.

16.  

HM, GC(sb)

Growler needs work, see Note 1.
5/19/00

Test / Repair growler in FER.

17.  

HM, GC(sb)

Done
Growler works.
5/19/00

Test / Repair growler in Crew’s Mess.

18.  

---

---

Test / Repair growler in Radio Room.

19.  

---

---

Test / Repair growler in Control Room.

20.  

---

---

Repair and test growler in Conning Tower.

21.  

---

---

Replace missing handle on Ships Office growler.  Test / Repair growler by Ships Office.

22.  

---

---

Install and test growler in Wardroom.

23.  

---

---

Test / Repair growler in FTR.

24.  

---

---

Test / Repair growler in Radio Room.

25.  

 

 

Move crated master gyro internals from Taney to Torsk FTR Lower Flats.

26.  

---

---

Reinstall master gyro modules in Control Room.

 

 

NOTE 1:  Growler in FER needs more work.  Station selector switch handle is loose so cannot change selector switch position.  Growler crank is loose, needs several small mounting screws installed.


 

 

 

 

Ventilation

Task

By

Status

Description

1.      

HP

Free and Operating
Inspection covers missing from both sides.

Vent Damper between ATR and Maneuvering
Inspect, test, lubricate, and repair if necessary.

2.      

HP

Free and Operating
Inspection cover missing from AER side, inspection cover on Man side needs to be bolted up.

Vent Damper between Maneuvering and AER
Inspect, test, lubricate, and repair if necessary.

3.      

HP

Free and Operating
Inspection covers missing from both sides.  See Note 1.

Vent Damper between AER and FER
Inspect, test, lubricate, and repair if necessary.

4.      

HP

Seized in Open Position
Inspection covers missing from both sides. 

Air Supply Forward Vent Damper (Stbd side) between FER and After Battery
Inspect, test, lubricate, and repair if necessary.

5.      

HP

Free and Operating
See Note 2.

Air Return from Forward Vent Damper (Port side) between FER and After Battery
Inspect, test, lubricate, and repair if necessary.

6.      

HP

Seized in Open Position
Inspection covers missing from both sides. 

Air Supply Forward Vent Damper (Stbd side) between After Battery and Control Room
Inspect, test, lubricate, and repair if necessary.

7.      

HP

Free and Operating
Inspection covers missing from both sides.  See Note 3.

Air Return from Forward Vent Damper (Port side) between After Battery and Control Room
Inspect, test, lubricate, and repair if necessary.

8.      

---

----

Air Supply Forward Vent Damper (Stbd side) Vent Damper between Control Room and Fwd Battery
Inspect, test, lubricate, and repair if necessary.

9.      

---

---

Air Return from Forward Vent Damper (Port side) between Control Room and Forward Battery
Inspect, test, lubricate, and repair if necessary.

10.  

HP

Operating but, stiff
Inspection covers missing from both sides. 

Air Supply Forward Vent Damper (Stbd side) between Forward Battery and FTR
Inspect, test, lubricate, and repair if necessary.

11.  

---

---

Air Return from Forward Vent Damper (Port side) between Forward Battery and FTR
Inspect, test, lubricate, and repair if necessary.

12.  

HP

Seized And Shut
Needs to be disassembled and repaired.

Snorkel Induction Valve (Crew’s Mess over Galley)

13.  

 

 

 

14.  

 

 

 

15.  

 

 

 

 

 

Note 1:  The damper operating handle on the forward engine room side is hitting the Romex cable to space heater.  Cable needs to be re-routed.

 

Note 2:  The damper operating handle on the after battery (crew’s head - port) side is hitting the Romex cable to space heater.  Cable needs to be re-routed.

 

Note 3:  The damper operating handle on the forward battery side is hitting the emergency light. 

 


 

 

 

 

Potable Water

Task

By

Status

Description

1.      

---

---

Replace copper tubing for fresh water flushing in crew's head.

2.      

---

---

Repair shower fixtures in crew's showers.

3.      

---

---

Replace shower heads in crew's showers.

4.      

---

---

Locate and replace handwheel on CW valve to crews head sinks.  Port side locker in head.

5.      

---

---

Inspect #1 fresh water tank.  Use high pressure water to thoroughly clean the tank.

6.      

---

---

Inspect #2 fresh water tank.  Use high pressure water to thoroughly clean the tank.

7.      

DT

Done
5/13/00

Repair FW leak at ATR dockside stop valve.

8.      

 

 

Repair FW in FTR on coupling below WT door.

9.      

BL

Done
5/19/00

Free Cold Water valve to Pantry sink.  (Under sink)

10.  

---

---

Free and clean all FW stop valves to sinks, ice machine, scuttlebutt.

11.  

---

---

Pressurize, test and adjust 15# pressure regulator for #1 & 2 FW tanks. (Pantry closet)

12.  

 

 

 

13.  

 

 

 

14.  

 

 

 

15.  

 

 

 

 

 

 


 

 

 

 

Sanitary System

Task

By

Status

Description

1.      

 

Done
5/19/00

Repair or replace the fold-up sink in XO stateroom.

2.      

---

---

Repair fold-up sink in FTR under stairs.

3.      

---

---

Replace stbd. (inboard) sink basin in crews head.

4.      

---

---

Replace port (outboard)  sink basin in crews head.

5.      

---

---

Free crews head sink drain line stop valve.  (Under stbd sink)

6.      

---

---

Repair sink trap / drain line under galley sink.

7.      

---

---

Repair drain basket in Galley sink.

8.      

---

---

Reinstall grease trap in Galley sink.

9.      

---

---

Repair sink trap / drain line under pantry sink.

10.  

---

---

Repair strainer basket in Pantry sink.

11.  

---

---

Check operation / repair Yarway in Crew’s head.

12.  

---

---

Check operation / repair Yarway in FTR head.

13.  

---

---

Remove plywood between the stalls in crew’s head.  Replace with stainless steel.

14.  

BL

All drains open.
CPO slow.
5/20/00

Test / clear drain lines from all FB stateroom sinks to #1 Sanitary.

15.  

---

---

Free and lubricate hull stop for #2 Sanitary overboard.

16.  

---

---

Locate 90 degree 2 ½ inch diameter pipe spool that goes between #2 Sanitary and the overboard discharge line inside the crews head (aft crapper).

17.  

---

---

Test / clear crews head drain lines to #2 Sanitary tank.

18.  

 

 

 

19.  

 

 

 

20.  

 

 

 

21.  

 

 

 

22.  

 

 

 

23.  

 

 

 

24.  

 

 

 

25.  

 

 

 

 

 

 


 

 

 

 

Deck

Task

By

Status

Description

1.      

---

---

Reinstall the deck plates outboard the #1 engine (FER stbd side).  Retap the holes for deck plate screws if necessary.

2.      

---

---

Reinstall the deck plates outboard the #2 engine (FER port side).  Retap the holes for deck plate screws if necessary.

3.      

---

---

Reinstall the deck plates outboard the #3 engine (AER stbd side).  Retap the holes for deck plate screws if necessary.

4.      

---

---

Reinstall the deck plates outboard the #4 engine (AER port side).  Retap the oles for deck plate screws if necessary.

5.      

---

---

Reinstall the deck plates in forward end of FER.  Retap the holes for deck plate screws if necessary.

6.      

---

Rained out!

Topside Deck Replacement.

7.      

---

Rained out!

Topside Deck Painting.

8.      

 

Rained out!

Open and visually (from outside) check all tanks (MBTs, FBTs, AUX, Safety, Trim, etc.) to verify condition, and fill level.

9.      

BB

Done
5/20/00

Tighten AER ladder.

10.  

GV & Friends

Done
5/20/00

Hang centerline racks in crew’s berthing

 


 

 

 

 

Weapons

Task

By

Status

Description

1.      

FM, BB, Torsk Bandits

Done
5/20/00

Install ATR Skid Mounts & Mine Table

2.      

---

---

ATR - Lower starboard (#9?) tube lower site gauge indicates about 6 inches of water in the tube.  Inspect the tube for water.  Inspect and test gauge and replace if necessary.

3.      

---

---

ATR – Open and inspect all four tubes.

4.      

---

---

FTR – Open and inspect all six tubes.

5.      

---

---

ATR – Pump bilges.  Remove all debris and clean bilges.

6.      

GB, FM, MH, others

Done
5/19/00

Move MK14 torpedo and 3” guns from DH park to Matt Harris’s shop.

7.      

 

 

 

8.      

 

 

 

 


 

 

 

 

General Repair and Cleaning

Task

By

Status

Description

1.      

---

---

Field Day area under Trim Manifold, Diving Station, and Hydraulic Manifold.

2.      

JW, JK, BL, RB

Cleaned.  Scraped and painted fwd 1/3 of Con.  Needs more work.
5/20/00

Field Day Conning Tower.

3.      

---

---

Pressure wash pigeon droppings (any place is a good start).

4.      

---

Attempts failed!

Kill any slow pigeons.

5.      

JC, DH, DH, GV, JC

 

Done

 

Vice doesn’t fit.
Drawers still need cleaning.

---

 

Done

 

Done

 

Done

 

---

Major Field Day in Pump Room:

·        Disassemble and remove loose lockers from Pump Room.

·        Clean Pump Room workbench and install vice.

·        Remove all junk and trash and sort the good stuff.

·        Remove, clean, and reinstall Pump Room deck plates.

·        Install and screw deck plates in Pump Room.

·        Install parts drawers in workbench. (drawers in Dry Stores)

·        Sort parts in drawers (sink test junk).

6.      

GV, GB

Began sorting, but not completed. Inventory not begun.

Sort and inventory mechanical parts in Dry Stores.

7.      

FP

Postponed

Archives Construction in Forward Battery Well.

8.      

BF

Completed forward of trim tank.

Cleaning & Painting of FTR Bilge area.

 

9.      

GC (sb)

Completed everything except locker interiors.

Field Day Galley.

 

10.  

JC, DH, DH, JC

Completed. John Cole will be working on a plan for possibly getting the system operational.

Inspect Refrigeration Plant for possible future restoration/modification for use.

 

11.  

NY, DK, and rest of Radio Crew

Completed.

Radio Operations Saturday & Sunday

 

12.  

CB, JR, JA, MM

Injectors removed.  Jim Adams has them for testing.

Remove Fuel Injectors from #2 Main Engine for Cleaning & Pressure Testing.

 

13.  

LD, GV

Ice Machine dispenses ice (some), and water (lots).  Needs additional work.

Test Ice Machine in Crew’s Mess.