Task List
May Work Weekend
May 19, 20, 21 2000
|
|
|
|
ELECTRICAL – General Repair |
|
Task |
By |
Status |
Description |
|
1.
|
--- |
--- |
Install a
utility receptacle in the galley for a coffee pot. Wire the receptacle to ?? |
|
2.
|
--- |
--- |
Repair
inoperable light fixture in FER lower
level aft port corner. |
|
3.
|
--- |
--- |
Reinsulate
wires of light fixture in FER
lower level fwd stbd corner. Install
globe on fixture. |
|
4.
|
DF, RB, GP |
Done
|
Repair
fluorescent lamp in FER C/L over
#1 Engine. |
|
5.
|
DF, GP |
Light
works. Needs more repair. |
Repair
fluorescent lamp in AER over aft
end of #4 Engine (aft port corner). |
|
6.
|
RB |
Light
works. Needs more repair. |
Repair
inoperable fluorescent light fixture in control room aft stbd corner by
Radio. Replace ballasts. |
|
7.
|
RB |
Light
works. Needs more repair. |
Repair
inoperable fluorescent light fixture in control room aft port corner by Trim
Manifold. Replace ballasts. |
|
8.
|
RB |
Light
works. Needs more repair. |
Repair
inoperable fluorescent light fixture in control room aft port corner by Dive
Stand. Replace ballasts. |
|
9.
|
--- |
--- |
Repair
inoperable light fixture in dry stores below ladder. Reinsulate the wires. Install globe on fixture. |
|
10.
|
--- |
--- |
Reinsulate
the two remaining lights in dry stores, center light and port outboard
light. Install globes on fixtures. |
|
11.
|
--- |
--- |
Check galley
power panels for mixer circuit.
Trace power cable, if still installed, to find the cut end. Tag the cable. |
|
12.
|
--- |
--- |
Repair
inoperable light fixture in after port corner of maneuvering. Reinsulate the wires. Install globe on fixture. |
|
13.
|
AB |
Traced power leads to ATR head. Wires are not terminated. Cables should be pulled back to DC
lighting panel and terminated. |
Repair two
inoperable light fixtures in pyro locker, forward stbd corner of ATR.
Install globes on fixtures. |
|
14.
|
--- |
--- |
Trace the
source of the two cut cables located over the center of the #4 engine in
after engine room lower level. Tag
cables. |
|
15.
|
--- |
--- |
Clean,
repair, and paint the broken light fixture bracket for the light fixture in FER outboard of #1 engine. |
|
16.
|
--- |
--- |
Cut off
broken cover fastening barrels and screws and install new cover fasteners on
FB-124 fuse panel outboard port engine in FER. Use WD-40 to
lubricate cover fastening bolts. |
|
17.
|
--- |
--- |
Cut off
broken cover fastening barrels and screws and install new cover fasteners on
FB-124 fuse panel outboard port engine in AER. Use WD-40 to
lubricate cover fastening bolts. |
|
18.
|
--- |
--- |
Cut off
broken cover fastening barrels and screws and install new cover fasteners on
FB-124 fuse panel FDB-4 in Control Room. Use WD-40 to lubricate cover fastening
bolts. |
|
19.
|
--- |
--- |
Trace the ??
circuit in FB-124 fuse panel located in after port corner of control
room. Circuit has low resistance to
ground. Determine cause and repair. |
|
20.
|
--- |
--- |
Trace the ??
circuit in FB-124 fuse panel located in after port corner of control
room. Circuit has low resistance to
ground. Determine cause and repair. |
|
21.
|
DG, DF, AB |
Done
|
Repair stbd.
DC lighting circuit in forward battery well. |
|
22.
|
DG |
Done
|
Replace lamp
holder in pantry closet. (stbd. side fwd.) |
|
23.
|
DF |
Done
|
Repair mirror
light in XO SR. |
|
24.
|
--- |
--- |
Replace
missing switch on 18-FB-102/103 (Fwd Battery, aft bulkhead). |
|
25.
|
--- |
--- |
Replace
missing switch on 13-FB-102 (Control Room, stbd. by IC swbd). |
|
26.
|
--- |
--- |
Replace two
AC receptacles on fwd. stbd. bulkhead in Crews Berthing. |
|
27.
|
--- |
--- |
Trace the
power source for the Yarway lights in Crew’s head. |
|
28.
|
--- |
--- |
Trace the
power source for the Yarway lights in FTR head. |
|
29.
|
--- |
--- |
Sort and
inventory electrical parts in Dry Stores. |
|
30.
|
MW, PO |
Done |
Reinsulate
wires in DC fixture on forward port side of FTR escape trunk. |
|
31.
|
MW, PO |
Done |
Reinstall rig
for red light in FTR head. |
|
32.
|
MW, PO |
Done |
Check all
globes in FTR for proper installation (Red on rig for red lights, clear on
others). |
|
33.
|
MW, DR |
Done |
Repair DC
light in forward port corner of FTR
outboard tubes 2, 4, & 6. |
|
34.
|
MW, PO |
Replaced light bulb. Light still does not work. |
Repair light
in forward stbd corner of FTR
outboard tubes 1, 3, & 5. |
|
35.
|
MW |
Removed ceramic light fixture. Repairing pressure tight fixture, will install later. |
Replace light
fixture in FTR escape trunk with a pressure tight light fixture. |
|
36.
|
DF |
All three lights work. Some repair still needed. |
Repair
fluorescent lights in officers passageway. |
|
37.
|
--- |
--- |
Repair the
light switch for bunk lamp on top outboard rack of CPO quarters. |
|
38.
|
--- |
--- |
Repair the
light switch in closet for overhead light in CPO quarters. |
|
39.
|
|
|
|
|
40.
|
|
|
|
|
|
|
ELECTRICAL – Shore Power |
|
|
Task |
Priority |
Status |
Description |
|
1.
|
DT, ME |
Done
|
Disconnect
two of the FB-0201 (POS) cables in the port cubicle in maneuvering. Continuity check the two cables to
identify the other end in after battery.
Tag the cables #1 and #2 at both ends. |
|
2.
|
DT |
Done |
Megger the
two of the FB-0201 (POS) cables.
Record the insulation resistance of each cable to ground. |
|
3.
|
--- |
--- |
Remove shore
power junction box and cable from sail.
Disconnect the cable from the shore power junction box in AER. |
|
4.
|
|
|
|
|
5.
|
|
|
|
|
6.
|
|
|
|
|
7.
|
|
|
|
|
8.
|
|
|
|
|
9.
|
|
|
|
|
10.
|
|
|
|
NOTE 1: Removed a section of the NEG bus bar in Port Motor Cubicle and stored it and the mounting hardware in the Maneuvering Electrical locker #7.
NOTE 2: Resistance to ground approximately 10 megohm on both cables.
|
|
|
ELECTRICAL – Emergency
Lighting |
|
|
Task |
By |
Status |
Description |
|
1.
|
DT, ME, JE |
Done5/20/00 |
Go through
the boat and place all emergency light switches in the ON position. Close the power disconnect switch in after
battery well. Megger the power cables
in after battery well. Record the
insulation resistance of each power cable to ground. |
|
2.
|
DT, ME, JE |
Done5/20/00 |
Close the
power disconnect switch in forward battery well. Megger the power cables in forward battery well. Record the insulation resistance of each
power cable to ground. |
|
3.
|
DT, GC, DF, ME, JE |
Tested all lights in Fwd Batt, Cntrl Rm, Con
Twr, Pump Rm, Plot, Aft Batt, FER(UL), AER(UL), Man |
Test all
emergency lights using 120V AC.
Replace light bulbs and repair light fixtures as necessary. |
|
4.
|
|
|
|
|
5.
|
|
|
|
|
6.
|
|
|
|
|
7.
|
|
|
|
|
8.
|
|
|
|
|
9.
|
|
|
|
|
10.
|
|
|
|
NOTE 1: Still need to check lights in FER(LL), AER(LL), ATR, FTR, Motor Rm. Several lights required new bulbs. One light missing in After battery from port emergency lighting and one light missing in After battery from stbd emergency lighting. All other lights work.
|
|
|
|
Interior Communications |
|
Task |
By |
Status |
Description |
|
1.
|
HM, GC(sb) |
Done |
Test / Repair
sound powered handset at ATR growler. |
|
2.
|
HM, GC(sb) |
Done |
Test / Repair
sound powered handset at Maneuvering room growler. |
|
3.
|
HM, GC(sb) |
Handset
needs to be replaced. |
Test / Repair
sound powered handset at AER growler. |
|
4.
|
HM, GC(sb) |
Done |
Test / Repair
sound powered handset at FER growler. |
|
5.
|
HM, GC(sb) |
Done |
Test / Repair
sound powered handset at Crew’s Mess growler. |
|
6.
|
--- |
--- |
Test / Repair
sound powered handset at Radio Room growler. |
|
7.
|
--- |
--- |
Install and
test sound powered handset at Control Room growler. |
|
8.
|
--- |
--- |
Test / Repair
sound powered handset at Conning Tower growler. |
|
9.
|
--- |
--- |
Test / Repair
sound powered handset in CO’s Stateroom. |
|
10.
|
--- |
--- |
Test / Repair
sound powered handset at Wardroom growler. |
|
11.
|
--- |
--- |
Install and
test sound powered handset at FTR growler. |
|
12.
|
--- |
--- |
Test / Repair
sound powered handset at Radio Room growler. |
|
13.
|
HM, GC(sb) |
Done |
Test / Repair
growler in ATR. |
|
14.
|
HM, GC(sb) |
Done |
Test / Repair
growler in Maneuvering. |
|
15.
|
HM, GC(sb) |
Done |
Test / Repair
growler in AER. |
|
16.
|
HM, GC(sb) |
Growler needs work, see Note 1. |
Test / Repair
growler in FER. |
|
17.
|
HM, GC(sb) |
Done |
Test / Repair
growler in Crew’s Mess. |
|
18.
|
--- |
--- |
Test / Repair
growler in Radio Room. |
|
19.
|
--- |
--- |
Test / Repair
growler in Control Room. |
|
20.
|
--- |
--- |
Repair and
test growler in Conning Tower. |
|
21.
|
--- |
--- |
Replace
missing handle on Ships Office growler.
Test / Repair growler by Ships Office. |
|
22.
|
--- |
--- |
Install and
test growler in Wardroom. |
|
23.
|
--- |
--- |
Test / Repair
growler in FTR. |
|
24.
|
--- |
--- |
Test / Repair
growler in Radio Room. |
|
25.
|
|
|
Move crated
master gyro internals from Taney to Torsk FTR Lower Flats. |
|
26.
|
--- |
--- |
Reinstall master gyro
modules in Control Room. |
NOTE 1: Growler in FER needs more work. Station selector switch handle is loose so cannot change selector switch position. Growler crank is loose, needs several small mounting screws installed.
|
|
|
|
Ventilation |
|
Task |
By |
Status |
Description |
|
1.
|
HP |
Free
and Operating |
Vent Damper
between ATR and Maneuvering |
|
2.
|
HP |
Free
and Operating |
Vent Damper
between Maneuvering and AER |
|
3.
|
HP |
Free
and Operating |
Vent Damper
between AER and FER |
|
4.
|
HP |
Seized
in Open Position |
Air Supply
Forward Vent Damper (Stbd side) between FER and After Battery |
|
5.
|
HP |
Free
and Operating |
Air Return
from Forward Vent Damper (Port side) between FER and After Battery |
|
6.
|
HP |
Seized
in Open Position |
Air Supply
Forward Vent Damper (Stbd side) between After Battery and Control Room |
|
7.
|
HP |
Free
and Operating |
Air Return
from Forward Vent Damper (Port side) between After Battery and Control Room |
|
8.
|
--- |
---- |
Air Supply
Forward Vent Damper (Stbd side) Vent Damper between Control Room and Fwd
Battery |
|
9.
|
--- |
--- |
Air Return
from Forward Vent Damper (Port side) between Control Room and Forward Battery
|
|
10.
|
HP |
Operating
but, stiff |
Air Supply
Forward Vent Damper (Stbd side) between Forward Battery and FTR |
|
11.
|
--- |
--- |
Air Return
from Forward Vent Damper (Port side) between Forward Battery and FTR |
|
12.
|
HP |
Seized And Shut
|
Snorkel
Induction Valve (Crew’s Mess over Galley) |
|
13.
|
|
|
|
|
14.
|
|
|
|
|
15.
|
|
|
|
Note 1: The damper operating handle on the forward engine room side is
hitting the Romex cable to space heater.
Cable needs to be re-routed.
Note 2: The damper operating handle on the after battery (crew’s head -
port) side is hitting the Romex cable to space heater. Cable needs to be re-routed.
Note 3: The damper operating handle on the forward battery side is
hitting the emergency light.
|
|
|
|
Potable Water |
|
Task |
By |
Status |
Description |
|
1.
|
--- |
--- |
Replace
copper tubing for fresh water flushing in crew's head. |
|
2.
|
--- |
--- |
Repair shower
fixtures in crew's showers. |
|
3.
|
--- |
--- |
Replace
shower heads in crew's showers. |
|
4.
|
--- |
--- |
Locate and
replace handwheel on CW valve to crews head sinks. Port side locker in head. |
|
5.
|
--- |
--- |
Inspect #1
fresh water tank. Use high pressure
water to thoroughly clean the tank. |
|
6.
|
--- |
--- |
Inspect #2
fresh water tank. Use high pressure
water to thoroughly clean the tank. |
|
7.
|
DT
|
Done |
Repair FW
leak at ATR dockside stop valve. |
|
8.
|
|
|
Repair FW in
FTR on coupling below WT door. |
|
9.
|
BL |
Done |
Free Cold
Water valve to Pantry sink. (Under
sink) |
|
10.
|
--- |
--- |
Free and
clean all FW stop valves to sinks, ice machine, scuttlebutt. |
|
11.
|
--- |
--- |
Pressurize,
test and adjust 15# pressure regulator for #1 & 2 FW tanks. (Pantry
closet) |
|
12.
|
|
|
|
|
13.
|
|
|
|
|
14.
|
|
|
|
|
15.
|
|
|
|
|
|
|
|
Sanitary System |
|
Task |
By |
Status |
Description |
|
1.
|
|
Done |
Repair or
replace the fold-up sink in XO stateroom. |
|
2.
|
--- |
--- |
Repair
fold-up sink in FTR under stairs. |
|
3.
|
--- |
--- |
Replace stbd.
(inboard) sink basin in crews head. |
|
4.
|
--- |
--- |
Replace port
(outboard) sink basin in crews head. |
|
5.
|
--- |
--- |
Free crews
head sink drain line stop valve.
(Under stbd sink) |
|
6.
|
--- |
--- |
Repair sink
trap / drain line under galley sink. |
|
7.
|
--- |
--- |
Repair drain
basket in Galley sink. |
|
8.
|
--- |
--- |
Reinstall
grease trap in Galley sink. |
|
9.
|
--- |
--- |
Repair sink
trap / drain line under pantry sink. |
|
10.
|
--- |
--- |
Repair
strainer basket in Pantry sink. |
|
11.
|
--- |
--- |
Check
operation / repair Yarway in Crew’s head. |
|
12.
|
--- |
--- |
Check
operation / repair Yarway in FTR head. |
|
13.
|
--- |
--- |
Remove
plywood between the stalls in crew’s head.
Replace with stainless steel. |
|
14.
|
BL |
All drains open. |
Test / clear
drain lines from all FB stateroom sinks to #1 Sanitary. |
|
15.
|
--- |
--- |
Free and
lubricate hull stop for #2 Sanitary overboard. |
|
16.
|
--- |
--- |
Locate 90
degree 2 ½ inch diameter pipe spool that goes between #2 Sanitary and the
overboard discharge line inside the crews head (aft crapper). |
|
17.
|
--- |
--- |
Test / clear
crews head drain lines to #2 Sanitary tank. |
|
18.
|
|
|
|
|
19.
|
|
|
|
|
20.
|
|
|
|
|
21.
|
|
|
|
|
22.
|
|
|
|
|
23.
|
|
|
|
|
24.
|
|
|
|
|
25.
|
|
|
|
|
|
|
|
Deck |
|
Task |
By |
Status |
Description |
|
1.
|
--- |
--- |
Reinstall the
deck plates outboard the #1 engine (FER stbd side). Retap the holes for deck plate screws if necessary. |
|
2.
|
--- |
--- |
Reinstall the
deck plates outboard the #2 engine (FER port side). Retap the holes for deck plate screws if necessary. |
|
3.
|
--- |
--- |
Reinstall the
deck plates outboard the #3 engine (AER stbd side). Retap the holes for deck plate screws if necessary. |
|
4.
|
--- |
--- |
Reinstall the
deck plates outboard the #4 engine (AER port side). Retap the oles for deck plate screws if necessary. |
|
5.
|
--- |
--- |
Reinstall the
deck plates in forward end of FER.
Retap the holes for deck plate screws if necessary. |
|
6.
|
--- |
Rained out! |
Topside Deck
Replacement. |
|
7.
|
--- |
Rained out! |
Topside Deck
Painting. |
|
8.
|
|
Rained out! |
Open and
visually (from outside) check all tanks (MBTs, FBTs, AUX, Safety, Trim, etc.)
to verify condition, and fill level. |
|
9.
|
BB |
Done |
Tighten AER
ladder. |
|
10.
|
GV & Friends |
Done |
Hang centerline racks in
crew’s berthing |
|
|
|
|
Weapons |
|
Task |
By |
Status |
Description |
|
1.
|
FM, BB, Torsk Bandits |
Done
|
Install ATR Skid Mounts & Mine Table |
|
2.
|
--- |
--- |
ATR - Lower
starboard (#9?) tube lower site gauge indicates about 6 inches of water in
the tube. Inspect the tube for
water. Inspect and test gauge and
replace if necessary. |
|
3.
|
--- |
--- |
ATR – Open
and inspect all four tubes. |
|
4.
|
--- |
--- |
FTR – Open
and inspect all six tubes. |
|
5.
|
--- |
--- |
ATR – Pump
bilges. Remove all debris and clean
bilges. |
|
6.
|
GB, FM, MH, others |
Done
|
Move MK14
torpedo and 3” guns from DH park to Matt Harris’s shop. |
|
7.
|
|
|
|
|
8.
|
|
|
|
|
|
|
|
General Repair and Cleaning |
|
Task |
By |
Status |
Description |
|
1.
|
--- |
--- |
Field Day
area under Trim Manifold, Diving Station, and Hydraulic Manifold. |
|
2.
|
JW, JK, BL, RB |
Cleaned.
Scraped and painted fwd 1/3 of Con.
Needs more work. |
Field Day
Conning Tower. |
|
3.
|
--- |
--- |
Pressure wash
pigeon droppings (any place is a good start). |
|
4.
|
--- |
Attempts failed! |
Kill any slow
pigeons. |
|
5.
|
JC, DH, DH, GV, JC |
Done Vice doesn’t fit.
|
Major Field Day in Pump Room: ·
Disassemble and remove loose lockers from Pump Room. ·
Clean Pump Room workbench and install vice. ·
Remove all junk and trash and sort the good stuff. ·
Remove, clean, and reinstall Pump Room deck plates. ·
Install and screw deck plates in Pump Room. ·
Install parts drawers in workbench. (drawers in Dry Stores) ·
Sort parts in drawers (sink test junk). |
|
6.
|
GV, GB |
Began sorting, but not completed. Inventory not begun. |
Sort and
inventory mechanical parts in Dry Stores. |
|
7.
|
FP |
Postponed |
Archives Construction in Forward Battery Well. |
|
8.
|
BF |
Completed forward
of trim tank. |
Cleaning & Painting of
FTR Bilge area. |
|
9.
|
GC (sb) |
Completed
everything except locker interiors. |
Field Day Galley. |
|
10.
|
JC, DH, DH, JC |
Completed. John
Cole will be working on a plan for possibly getting the system operational. |
Inspect Refrigeration
Plant for possible future restoration/modification for use. |
|
11.
|
NY, DK, and rest of Radio Crew |
Completed. |
Radio Operations Saturday
& Sunday |
|
12.
|
CB, JR, JA, MM |
Injectors
removed. Jim Adams has them for
testing. |
Remove Fuel Injectors from
#2 Main Engine for Cleaning & Pressure Testing. |
|
13.
|
LD, GV |
Ice Machine dispenses
ice (some), and water (lots). Needs additional
work. |
Test Ice Machine in Crew’s
Mess. |